{"id":81755,"date":"2020-11-18T21:05:00","date_gmt":"2020-11-18T22:05:00","guid":{"rendered":"https:\/\/resourcework2.devstudio.work\/?p=81755"},"modified":"2024-11-13T11:42:13","modified_gmt":"2024-11-13T11:42:13","slug":"4-bc-resource-files","status":"publish","type":"post","link":"https:\/\/resourcework2.devstudio.work\/?p=81755","title":{"rendered":"4 BC resource files to watch as cabinet is announced"},"content":{"rendered":"\n<p>The BC NDP\u2019s early election bid proved to be a resounding success. They not only held on to all of their 2017 gains, but they also secured a majority, which should keep the government in power for the full four years.&nbsp;<\/p>\n\n\n\n<p>Another victory for the NDP is now being able to ditch reliance on the Greens, where some friction was evident over the last term on&nbsp;<a href=\"https:\/\/www.straight.com\/news\/1218791\/bc-green-leader-andrew-weaver-calls-ndp-governments-lng-legislation-generational\">LNG<\/a>, the renters\u2019 rebate, childcare, and&nbsp;<a href=\"https:\/\/vancouversun.com\/news\/politics\/b-c-greens-kill-ndps-proposed-change-to-unionized-secret-ballots\">labour law<\/a>. Though that is not to say that collaboration with the Green Party is out either.&nbsp;<\/p>\n\n\n\n<p>Plus, the NDP\u2019s own environment caucus is likely to push heavily on their issues \u2013 although the majority result certainly empowers the government to pursue its own agenda unabashedly.&nbsp;<\/p>\n\n\n\n<p>(Latest indication is that the big reveal will come on Thursday, November 26th.)<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>1. The Site C \u2018hot potato\u2019<\/strong><\/h1>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"799\" height=\"449\" src=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/image_1.jpg\" alt=\"\" class=\"wp-image-84366\" srcset=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/image_1.jpg 799w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/image_1-300x169.jpg 300w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/image_1-768x432.jpg 768w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><\/figure>\n\n\n\n<p>By all accounts, a tough decision is likely ahead for Premier Horgan\u2019s team on Site C. Forecast to burn through its contingency reserve (held by the Ministry of Finance), the hydroelectric dam is facing significant challenges as costly geotechnical concerns have been&nbsp;<a href=\"https:\/\/vancouversun.com\/opinion\/columnists\/vaughn-palmer-suspect-timing-for-latest-update-on-problematic-holes-at-site-c\">unearthed in recent months<\/a>. A competent and confident Energy and Mines Minister will be key to navigating the hand wringing going on around the construction project.<\/p>\n\n\n\n<p>But let\u2019s also be clear \u2013 cancellation&nbsp;<em>would<\/em>&nbsp;be a mess. A major capital investment has been made by BC Hydro and two foremost BC ambitions rely on the project being successfully completed: that\u2019s export of liquefied natural gas and transport electrification as we move to a lower-emissions economy.<\/p>\n\n\n\n<p>Not to mention that even before COVID, residential growth had already resulted in&nbsp;<a href=\"https:\/\/www.bchydro.com\/news\/press_centre\/news_releases\/2020\/cold-snap-peak-demand.html#:~:text=VANCOUVER%3A%20BC%20Hydro%20has%20set,when%20consumption%20reached%2010%2C302%20megawatts.\">record-breaking spikes in electricity demand<\/a>, especially in colder months. That trend has every likelihood of continuing, making bringing Site C\u2019s additional generation capacity online a real priority for both energy affordability and reliability.<\/p>\n\n\n\n<p>If we stop construction and fail to deliver it into a revenue generating property, the money already spent on the project would transition to an expense, not a capital investment. This accounting technicality could put ridiculous, undue pressure on the company, necessitating a pricey rescue by Victoria.<\/p>\n\n\n\n<p>The last time a review was made, back in 2017,&nbsp;<a href=\"https:\/\/biv.com\/article\/2017\/11\/government-questions-bcuc-site-c-report\">cancellation was calculated to cost $4 billion<\/a>. No surprise that government instead proceeded with the project at that time. That figure is certain to be much higher today.<\/p>\n\n\n\n<p>It does seem like continuation is very likely in the cards, though it remains to be seen whether its cost would be remembered by voters \u2013 and whether the BC NDP would be especially concerned about eating a political cost for incurring it.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>2. Mining for the future<\/strong><\/h1>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/battery-powered-mining-equipment.jpg\" alt=\"\" class=\"wp-image-84367\" srcset=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/battery-powered-mining-equipment.jpg 1000w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/battery-powered-mining-equipment-300x225.jpg 300w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/battery-powered-mining-equipment-768x576.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<p>Mining is keenly positioning itself as a natural partner to government in its low emissions aspirations. Critical minerals in particular have firmly entered the public policy consciousness, and Canada\u2019s federal government has made its interest in&nbsp;<a href=\"https:\/\/www.canada.ca\/en\/natural-resources-canada\/news\/2020\/01\/canada-and-us-finalize-joint-action-plan-on-critical-minerals-collaboration.html\">Canada-US cooperation on the file clear<\/a>.<\/p>\n\n\n\n<p>Fully realizing the potential of BC\u2019s mining and mining exploration sectors \u2013 for energy transition, employment, and social development \u2013 will require some more work by the provincial government to enable success.<\/p>\n\n\n\n<p>The mandate letter is a prime opportunity to do just that: set the expectation upfront that mining opportunities be given a reliable runway, delivering on the&nbsp;<a href=\"https:\/\/www.bcndp.ca\/platform\">platform commitment<\/a>&nbsp;to secure \u201cA stronger future for BC\u2019s mining industry and workers.\u201d<\/p>\n\n\n\n<p>As it stands, timeliness of permitting through the BC EAO remains&nbsp;<a href=\"https:\/\/www.mining.bc.ca\/sites\/default\/files\/PwC%20Report%202020.pdf\">a major concern for competitiveness<\/a>. Fortunately, this can be fixed simply with more human resources for administration and mine inspection.&nbsp;<\/p>\n\n\n\n<p>A clear path and reasonable timelines for the consultation piece of permit approval would also bolster industry confidence.&nbsp;<\/p>\n\n\n\n<p>Just as on the federal front, conservation decisions&nbsp;\u2013&nbsp;indeed all land use decisions&nbsp;\u2013&nbsp;must be made with a strong, evidence-based understanding of mineral potential. This is what we found in our&nbsp;<a href=\"https:\/\/img1.wsimg.com\/blobby\/go\/440cd8f9-f39c-4065-bd50-ffde20ccc613\/downloads\/SUMMARY%20-%20Securing%20Canada%E2%80%99s%20Economic%20Future.pdf?ver=1605019225250\"><em>Securing Canada\u2019s Economic Future<\/em><\/a>&nbsp;report this summer&nbsp;\u2013&nbsp;and what we hope the reelected BC government pays attention to as it proceeds with its plans.<\/p>\n\n\n\n<p>Lastly, regional cooperation involving transboundary issues with the United States will be another hot file to watch. Shared watersheds but different environmental rules and processes (BC, Washington, Alaska, and Montana) mean that collaboratively addressing environment and resources can get very technical, very fast.&nbsp;<\/p>\n\n\n\n<p>Maintaining strong regional dialogue is possible, and organizations such as&nbsp;<a href=\"http:\/\/www.pnwer.org\/\">PNWER<\/a>, the Pacific NorthWest Economic Region, are worth investing time into.&nbsp;<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>3. Putting forestry communities first<\/strong><\/h1>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"960\" height=\"720\" src=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/86773274_3515971058474006_8701007973897469952_n.jpg\" alt=\"\" class=\"wp-image-84369\" srcset=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/86773274_3515971058474006_8701007973897469952_n.jpg 960w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/86773274_3515971058474006_8701007973897469952_n-300x225.jpg 300w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/86773274_3515971058474006_8701007973897469952_n-768x576.jpg 768w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><\/figure>\n\n\n\n<p>As part of the BC NDP\u2019s \u201cTackling Climate Change, Protecting Nature\u201d commitments in the<a href=\"https:\/\/www.bcndp.ca\/platform\">&nbsp;2020 Platform<\/a>, the party pledged to protect \u201cmore of BC\u2019s old-growth forests.\u201d This came on the heels of the release of the hotly anticipated Gorley-Merkel Report (the result of&nbsp;<a href=\"https:\/\/engage.gov.bc.ca\/app\/uploads\/sites\/563\/2020\/09\/STRATEGIC-REVIEW-20200430.pdf\">the Old Growth Strategic Review<\/a>).<\/p>\n\n\n\n<p>On the campaign trail, Premier John Horgan pledged to \u201cimplement the report in its totality\u201d \u2013 which caused some alarm in forestry communities where the harvestable land base is already uncertain.<\/p>\n\n\n\n<p>It\u2019s a complex piece of analysis, to be sure. Discussion within the report of adopting a \u201cthree-zone forest management framework to guide forest planning and decision-making\u201d may be the real positive note here.<\/p>\n\n\n\n<p>In addition to protecting that working forest land base, the forestry industry is counting on government continuing the forward momentum on low-carbon, green buildings. 2019 changes to the provincial Building Code&nbsp;<a href=\"https:\/\/www.canadianconsultingengineer.com\/buildings\/b-c-building-code-to-allow-12-storey-mass-timber-builds\/1003408911\/\">represented just that<\/a>, and now mass-timber construction projects are&nbsp;<a href=\"https:\/\/www.timescolonist.com\/business\/ground-breaking-for-mass-timber-condo-project-near-mayfair-1.24240438\">springing up across BC as we speak<\/a>.<\/p>\n\n\n\n<p>Overall, strong responsivity to the needs of rural communities, right off the bat, will only help the BC NDP set the right tone for engagement over the next four years. Framing the implementation of the review within concern for forestry workers, families, and small businesses would be the right place to start.<\/p>\n\n\n\n<p>In order to allay community worries, particularly on the North Island, the new Forestry Minister must be prepared to speak that language persuasively.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>4. Innovative energy opportunities<\/strong><\/h1>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"651\" height=\"1024\" src=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-651x1024.jpg\" alt=\"\" class=\"wp-image-84370\" srcset=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-651x1024.jpg 651w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-191x300.jpg 191w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-768x1208.jpg 768w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-977x1536.jpg 977w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-1302x2048.jpg 1302w, https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/welder-scaled.jpg 1628w\" sizes=\"(max-width: 651px) 100vw, 651px\" \/><\/figure>\n\n\n\n<p>From creating jobs for workers and revenue for ambitious and compassionate social investments, to continuing to leverage&nbsp;<a href=\"https:\/\/bcbc.com\/reports-and-research\/b-c-s-low-carbon-advantage-1\">BC\u2019s low-carbon advantage<\/a>&nbsp;in its export industries, our natural resources are a significant asset for the province as a whole.<\/p>\n\n\n\n<p>A path forward for Emissions Intensive, Trade Exposed industries must be a part of that. Looking at government\u2019s high hopes for the Clean BC strategic vision, we see abundant opportunities to further what\u2019s already working for resources \u2013 and to improve on what could be done better.<\/p>\n\n\n\n<p>Done right, the upcoming&nbsp;<a href=\"https:\/\/www.princegeorgematters.com\/local-news\/bc-ndp-pledges-to-review-oil-and-gas-royalties-2792976\">BC royalty and credit review<\/a>&nbsp;can improve program efficiency while maintaining a solid future for the BC natural gas industry.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Anticipated investments in carbon capture, utilization and storage, per the platform, put energy innovation front and center.<\/p>\n\n\n\n<p><a href=\"https:\/\/ppforum.ca\/articles\/carbon-capture-utilization-and-storage-the-time-is-now\/\">CCUS&nbsp;<em>is<\/em>&nbsp;a crucial technology to get to net-zero<\/a>, but the province should also 1) pay attention to emerging opportunities in hydrogen, and 2) get our LNG bunkering prospects over the line.<\/p>\n\n\n\n<p>BC\u2019s natural gas assets have significant future value. Alberta industry is exploring the potential of its own chemical manufacturing industries to&nbsp;<a href=\"https:\/\/globalnews.ca\/news\/7465573\/hydrogen-study-alberta-industry-nov-16\/\">increasingly pivot to blue hydrogen<\/a>, a vaunted \u2018fuel of the future\u2019. Whether it\u2019s for export or domestic consumption, the business case for it is&nbsp;<a href=\"https:\/\/transitionaccelerator.ca\/wp-content\/uploads\/2020\/11\/Building-a-Transition-Pathway-to-a-Vibrant-Hydrogen-Economy-in-the-Alberta-Industrial-Heartland-November-2020-4.pdf\">premised on natural gas&nbsp;<\/a>as the feedstock, paired with carbon capture to nearly eliminate the emissions associated with production.&nbsp;<\/p>\n\n\n\n<p>Finally, LNG marine bunkering has been capturing the imagination of energy policy nerds \u2013 at least the ones here at Resource Works. In 2019, the BC government&nbsp;<a href=\"https:\/\/www.alaskahighwaynews.ca\/business\/b-c-government-kicks-in-25-000-to-lng-bunkering-proposal-1.23986613\">threw its support<\/a>&nbsp;\u2013 and some funding \u2013 behind a proposal by FortisBC and the Vancouver Fraser Port Authority.<\/p>\n\n\n\n<p>Imagine what gasifying the ships that call in the Port of Vancouver might mean for emissions reduction on a mega scale. (One expert recently suggested to us that that impact would be equivalent to nullifying all of BC\u2019s emissions. More on that in the coming months!)<\/p>\n\n\n\n<p>From locally providing fuels for vessels that traverse the globe to exporting fuels for use in foreign markets, BC has ample opportunities to make a positive impact on the global emissions picture.<\/p>\n\n\n\n<p>Saying yes to our highly productive, energy producing and transporting industries is a major way to get there.<\/p>\n\n\n\n<p><em>Margareta Dovgal is the Director of Research at the Resource Works Society. She holds a Master&#8217;s degree in Energy, Technology and Climate Policy from University College London. Follow her views on Twitter,&nbsp;<a href=\"https:\/\/twitter.com\/Margare7a\">@margare7a<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The quality of the Premier\u2019s Cabinet lineup will determine whether the government\u2019s agenda on these issues will land right \u2013 for their future electoral odds and for our province\u2019s economy.<\/p>\n","protected":false},"author":6,"featured_media":84365,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[140,241,227,135,90,28,242,25,183,11,94],"class_list":["post-81755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mining","tag-bc","tag-bc-government","tag-bcfa","tag-ccus","tag-critical-minerals","tag-forestry","tag-horgan","tag-lng","tag-lng-bunkering","tag-mining","tag-site-c"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>4 BC resource files to watch as cabinet is announced -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"4 BC resource files to watch as cabinet is announced -\" \/>\n<meta property=\"og:description\" content=\"The quality of the Premier\u2019s Cabinet lineup will determine whether the government\u2019s agenda on these issues will land right \u2013 for their future electoral odds and for our province\u2019s economy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/resourceworks\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-18T22:05:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-13T11:42:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"933\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Margareta Dovgal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Resource_Works\" \/>\n<meta name=\"twitter:site\" content=\"@Resource_Works\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Margareta Dovgal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/?p=81755\"},\"author\":{\"name\":\"Margareta Dovgal\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#\\\/schema\\\/person\\\/d012930037e74e0c79aef101555bbd23\"},\"headline\":\"4 BC resource files to watch as cabinet is announced\",\"datePublished\":\"2020-11-18T22:05:00+00:00\",\"dateModified\":\"2024-11-13T11:42:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/?p=81755\"},\"wordCount\":1406,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/post-image-2024-11-12T011652.433.jpg\",\"keywords\":[\"BC\",\"BC government\",\"BCFA\",\"CCUS\",\"critical minerals\",\"forestry\",\"Horgan\",\"LNG\",\"LNG bunkering\",\"mining\",\"site c\"],\"articleSection\":[\"Mining\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/?p=81755\",\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files\",\"name\":\"4 BC resource files to watch as cabinet is announced -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/post-image-2024-11-12T011652.433.jpg\",\"datePublished\":\"2020-11-18T22:05:00+00:00\",\"dateModified\":\"2024-11-13T11:42:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#primaryimage\",\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/post-image-2024-11-12T011652.433.jpg\",\"contentUrl\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2020\\\/11\\\/post-image-2024-11-12T011652.433.jpg\",\"width\":1400,\"height\":933},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/4-bc-resource-files#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"4 BC resource files to watch as cabinet is announced\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#website\",\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/\",\"name\":\"Resource Works\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#organization\",\"name\":\"Resource Works Society\",\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/RW-logo-02.png\",\"contentUrl\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/RW-logo-02.png\",\"width\":227,\"height\":87,\"caption\":\"Resource Works Society\"},\"image\":{\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/resourceworks\",\"https:\\\/\\\/x.com\\\/Resource_Works\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/resource-works\",\"https:\\\/\\\/www.instagram.com\\\/resource_works\\\/?hl=en\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCP4SxvFtt825df7iCIgN_IA\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/#\\\/schema\\\/person\\\/d012930037e74e0c79aef101555bbd23\",\"name\":\"Margareta Dovgal\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g\",\"caption\":\"Margareta Dovgal\"},\"url\":\"https:\\\/\\\/resourcework2.devstudio.work\\\/?author=6\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"4 BC resource files to watch as cabinet is announced -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files","og_locale":"en_US","og_type":"article","og_title":"4 BC resource files to watch as cabinet is announced -","og_description":"The quality of the Premier\u2019s Cabinet lineup will determine whether the government\u2019s agenda on these issues will land right \u2013 for their future electoral odds and for our province\u2019s economy.","og_url":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files","article_publisher":"https:\/\/www.facebook.com\/resourceworks","article_published_time":"2020-11-18T22:05:00+00:00","article_modified_time":"2024-11-13T11:42:13+00:00","og_image":[{"width":1400,"height":933,"url":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg","type":"image\/jpeg"}],"author":"Margareta Dovgal","twitter_card":"summary_large_image","twitter_creator":"@Resource_Works","twitter_site":"@Resource_Works","twitter_misc":{"Written by":"Margareta Dovgal","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#article","isPartOf":{"@id":"https:\/\/resourcework2.devstudio.work\/?p=81755"},"author":{"name":"Margareta Dovgal","@id":"https:\/\/resourcework2.devstudio.work\/#\/schema\/person\/d012930037e74e0c79aef101555bbd23"},"headline":"4 BC resource files to watch as cabinet is announced","datePublished":"2020-11-18T22:05:00+00:00","dateModified":"2024-11-13T11:42:13+00:00","mainEntityOfPage":{"@id":"https:\/\/resourcework2.devstudio.work\/?p=81755"},"wordCount":1406,"commentCount":0,"publisher":{"@id":"https:\/\/resourcework2.devstudio.work\/#organization"},"image":{"@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#primaryimage"},"thumbnailUrl":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg","keywords":["BC","BC government","BCFA","CCUS","critical minerals","forestry","Horgan","LNG","LNG bunkering","mining","site c"],"articleSection":["Mining"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#respond"]}]},{"@type":"WebPage","@id":"https:\/\/resourcework2.devstudio.work\/?p=81755","url":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files","name":"4 BC resource files to watch as cabinet is announced -","isPartOf":{"@id":"https:\/\/resourcework2.devstudio.work\/#website"},"primaryImageOfPage":{"@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#primaryimage"},"image":{"@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#primaryimage"},"thumbnailUrl":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg","datePublished":"2020-11-18T22:05:00+00:00","dateModified":"2024-11-13T11:42:13+00:00","breadcrumb":{"@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/resourcework2.devstudio.work\/4-bc-resource-files"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#primaryimage","url":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg","contentUrl":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2020\/11\/post-image-2024-11-12T011652.433.jpg","width":1400,"height":933},{"@type":"BreadcrumbList","@id":"https:\/\/resourcework2.devstudio.work\/4-bc-resource-files#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/resourcework2.devstudio.work\/"},{"@type":"ListItem","position":2,"name":"4 BC resource files to watch as cabinet is announced"}]},{"@type":"WebSite","@id":"https:\/\/resourcework2.devstudio.work\/#website","url":"https:\/\/resourcework2.devstudio.work\/","name":"Resource Works","description":"","publisher":{"@id":"https:\/\/resourcework2.devstudio.work\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/resourcework2.devstudio.work\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/resourcework2.devstudio.work\/#organization","name":"Resource Works Society","url":"https:\/\/resourcework2.devstudio.work\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/resourcework2.devstudio.work\/#\/schema\/logo\/image\/","url":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2025\/10\/RW-logo-02.png","contentUrl":"https:\/\/resourcework2.devstudio.work\/wp-content\/uploads\/2025\/10\/RW-logo-02.png","width":227,"height":87,"caption":"Resource Works Society"},"image":{"@id":"https:\/\/resourcework2.devstudio.work\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/resourceworks","https:\/\/x.com\/Resource_Works","https:\/\/www.linkedin.com\/company\/resource-works","https:\/\/www.instagram.com\/resource_works\/?hl=en","https:\/\/www.youtube.com\/channel\/UCP4SxvFtt825df7iCIgN_IA"]},{"@type":"Person","@id":"https:\/\/resourcework2.devstudio.work\/#\/schema\/person\/d012930037e74e0c79aef101555bbd23","name":"Margareta Dovgal","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3bd87fd6a4273299d1c0524ee073efd7040c7cb69244b74808dd93d6188afacb?s=96&d=mm&r=g","caption":"Margareta Dovgal"},"url":"https:\/\/resourcework2.devstudio.work\/?author=6"}]}},"_links":{"self":[{"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/posts\/81755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=81755"}],"version-history":[{"count":0,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/posts\/81755\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=\/wp\/v2\/media\/84365"}],"wp:attachment":[{"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=81755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=81755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/resourcework2.devstudio.work\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=81755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}